HousePrecheckCheck an address

1 Clairtrell RdToronto · zoning, lot size and permit records

Also 7A Clairtrell Rd, 7B Clairtrell Rd, 7C Clairtrell Rd, 7D Clairtrell Rd

Residential apartment · RA (f30.0; a1375) (x289)51.2 × 67.9 m3,199 m²on Espana Lanecorner, also on Clairtrell Rd

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.3 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 25 202628 (Proposed parking garage repairs, 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 13 development applications open within 300 m, up to 56 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: BayviewThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
51.2 m frontage67.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2022

    Needs a closer look

    Still open in the City's records: 22 137102 (Proposal to restore and protect the balcony systems and building caulking, 2022, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Zoning): 25 132891 ZON 00 IR (Zoning, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 202628 (Proposed parking garage repairs, 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 13 development applications open within 300 m

    Good to know

    13 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 56 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Building permit25 202628Permit Issued

    Proposed parking garage repairs.

    Aug 22, 2025 · 1 CLAIRTRELL RD
  • By-law investigation25 132891 ZON 00 IRClosed

    Zoning

    Mar 21, 2025 · 1 CLAIRTRELL RD
  • Building permit22 137102Permit Issued

    Proposal to restore and protect the balcony systems and building caulking.

    May 27, 2022 · 1 CLAIRTRELL RD
  • Building permit10 148083Closed

    Installation of backflow preventor

    Apr 22, 2010 · 1 CLAIRTRELL RD

Check before you build

  • Site-specific exception 900.7.10(289)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.7.10(289)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    City of Toronto by-law 739-2001.

By-law 569-2013, Chapter 900

Lot facts

Area
3,199 m²
Frontage
51.2 m
Depth
67.9 m
Street
Espana Lane
Corner lot
Yes, also on Clairtrell Rd67.9 m along it
Public lane
None
Max height
—
Max lot coverage
35%
  • Major Transit Station Area: Bayview. The lot is inside the Bayview Major Transit Station Area approved by the Province (Site and Area Specific Policy 728). Source
  • Sheppard East Subway Corridor Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Minimum frontage 30 m. Frontage is about 51.2 m: meets the zone minimum. Source
  • Minimum lot area 1375 m². Lot area is 3,199 m²: meets the minimum. Source
  • Zone RA (f30.0; a1375) (x289) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source
  • 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: pear chanticleer (15 cm), pear chanticleer (13 cm), pear chanticleer (13 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%21 of 21 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
20

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 21 variance decisions: more than at 52% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    Proposal to construct an exterior elevation addition, roof terrace renovations, and interior alterations t the existing building, to convert 16 Assisted Living Suites to 21 Memory Care Suites, add an elevator, covert a portion of the existing third floor terrace into a three season room, and adjust parking ratios. Please note, the application was deferred on February 16, 2023, to allow the applicant to address Transportation concerns.

    15 BARBERRY PL · Oct 12, 2023 · 464 m away
  • Minor varianceApproved

    To construct a new storage room in the underground parking

    15 BARBERRY PL · Apr 1, 2021 · 464 m away

Latest activity nearby

  • Minor variancePending

    Accepted

    2810 BAYVIEW AVE · Nov 20, 2026 · 221 m away
  • Building permit

    Proposal to remove the existing wooden ramp and replace it with a new barrier-free wooden ramp in the same location.

    2880 BAYVIEW AVE · Nov 5, 2026 · 142 m away
  • Development application

    Site Plan Control Application proposes the development of a 38-storey mixed-use building providing residential and commercial use at grade. The building will provide a total of 511 rental residential units, being a mix of studio, 1-bedroom, 2-bedroom, and 3-bedroom units. The building will also provide retail at grade. A paved access from Sheppard Ave E along the west property line will be provided, leading to 2 levels of below-grade parking, providing a total of 97 parking spaces; as well as 388 bicycle parking spaces. The proposed development provides a total GFA of 28,065 square metres and a FSI of 8.91. Additionally, the proposed development provides 795 square metres of indoor amenity space and 781 square metres of outdoor amenity space.

    500 SHEPPARD AVE E · Nov 3, 2026 · 59 m away · City file
  • Building permit

    The proposed scope of work includes addressing the roof deck leaks and replace the waterproofing membrane inside the underground garage. Also the drains will be replaced. In addition sections of the interlocking will be relevelled to eliminate any tripping hazard.

    21 CLAIRTRELL RD · Oct 27, 2026 · 180 m away
  • Zoning review

    Notice Sent

    46 GRANLEA RD · Oct 23, 2026 · 159 m away
  • Zoning review

    Closed

    333 SHEPPARD AVE E · Oct 22, 2026 · 88 m away
  • Zoning review

    Closed

    317 SHEPPARD AVE E · Oct 22, 2026 · 173 m away
  • Minor varianceApproved

    To alter the development standards, as approved by Site-Specific Zoning By-law 605-2026(OLT), for the proposed multi-tower mixed use development by modifying the building heights, including increasing the height of Tower 2 to 45-storeys, modifying the building setbacks and separation distances of main walls, as well as reducing the indoor and outdoor amenity space requirements.

    500 SHEPPARD AVE E · Oct 15, 2026 · 76 m away
  • Zoning review

    Closed

    333 SHEPPARD AVE E · Oct 6, 2026 · 88 m away
  • Building permitdemolition

    Full demolition of existing house in preparation for landscaping and parkland dedication. This project is tied to 2810 Bayview Ave. [ref: 25 180089 NNY 18 SA]

    33 GRANLEA RD · Sep 25, 2026 · 171 m away

Neighbourhood: East Willowdale

About the area around the lot, not the lot itself.

Nearest station
Bayview Station3 min walk
Nearest TTC stop
Bayview Ave at Sheppard Ave East - Bayview Station2 min walk
Nearest cycling route
Sheppard Ave ECycle Track, 1 min walk
Nearest traffic count
18,492 vehicles in 8 hSheppard Ave E / Clairtrell Rd, 50 m away, Mar 29, 2022
Serious collisions within 500 m
42021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 1 with cyclists
Parks
Bayview Parkette2 min walk
Kenaston Gardens Parkette4 min walk
Arc Park5 min walk

Schools within 1 km

  • ST GABRIEL CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
  • HOLLYWOOD PUBLIC SCHOOL English Public 8 min walk
  • ST GEORGE ACADEMY Private 8 min walk
  • NEWTON INTERNATIONAL COLLEGE SCHOOL Private 14 min walk
  • CENTRAL MONTESSORI SCHOOL - WILLOWDALE Private 14 min walk
  • CORNELL INTERNATIONAL ACADEMY Private 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEast WillowdaleMedian neighbourhood
Median household income (2020)$95,000$84,500
Households that own their home70%54%
Population (2021)15,48516,813
Homes built in 1960 or before15%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEast WillowdaleCity median
Assault295.1636.3
Robbery56.869.5
Shootings5.710.5
Auto theft181.6192.6
Theft over $5,00051.146.1
Break and enter198.6172.8
Theft from vehicles193188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.