Commercial residential · CR 7.8 (c4.5; r7.8) SS1 (x62)48.2 × 54.0 m2,231 m²on Bloor St Wcorner, also on Yonge Stbacks onto Ln S Bloor E Balmuto

Not a home

A commercial or mixed-use building

8 different civic addresses share this parcel, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 22 141771 (Fit out for Hotel Suites Levels 7-16 (10 floor plates) with back of house Hotel Service..., 2022, status Permit Issued); 22 102049 (Fit out for Hotel Amenities (Lobby, Restaurant, Fitness Area and Public washrooms) and..., 2022, status Permit Issued); 21 247526 (Proposed interior alterations for fit-out of cafeteria with bar and lounge and kitchen..., 2022, status Permit Issued); and 2 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 23 development applications open within 300 m, up to 94 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: Bloor-YongeThe City plans more homes around the station: good for transit, and more building over time.
N20 m
48.2 m frontage54.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 5 building permits open, the oldest since 2018

    Needs a closer look

    Still open in the City's records: 22 141771 (Fit out for Hotel Suites Levels 7-16 (10 floor plates) with back of house Hotel Service..., 2022, status Permit Issued); 22 102049 (Fit out for Hotel Amenities (Lobby, Restaurant, Fitness Area and Public washrooms) and..., 2022, status Permit Issued); 21 247526 (Proposed interior alterations for fit-out of cafeteria with bar and lounge and kitchen..., 2022, status Permit Issued); and 2 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards): 26 105706 PRS 00 IR (Property Standards, 2026); 25 145884 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 23 development applications open within 300 m

    Good to know

    23 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 94 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

83 records on file: more than at 100% of Toronto houses (median 0).

  • Development application26 225192 STE 11 SAClosed
    Aug 25, 2026 · 1 BLOOR ST W
  • Building permit26 144038Approved

    Alternative Solution to waive the fire separation requirements for floor assemblies within the four-storey residential units.

    Apr 15, 2026 · 1 BLOOR ST W
  • By-law investigation26 105706 PRS 00 IRClosed

    Property Standards

    Jan 16, 2026 · 1 BLOOR ST W
  • Building permit25 207363Cancelled

    this alternative solution has been prepared to provide a rationale supported by the alternative solution using the objective and functional statements of the objectives based on the 2012 ontario building code, to waive the fire separation requirements for floor assemblies within the four-storey residential units located within the one bloor street west project.

    Aug 8, 2025 · 1 BLOOR ST W
  • Building permit25 207349Approved

    this alternative solution has been prepared to address the proposed condition of the firefighters elevator serving the above-noted project. based on the proposed design, the designated firefighters¿ elevator will stop at level 82, and will not serve the remaining floors (i.e., multi-storey units) above level 82 in the building.

    Aug 8, 2025 · 1 BLOOR ST W
  • By-law investigation25 145884 PRS 00 IRClosed

    Property Standards

    Apr 16, 2025 · 1 BLOOR ST W
  • Building permit22 141771Permit Issued

    Fit out for Hotel Suites Levels 7-16 (10 floor plates) with back of house Hotel Service Room, in connection with new mixed use building

    Oct 12, 2022 · 1 BLOOR ST W
  • Building permit22 172498Approved

    Alternative Solution contains a rationale to support a design of the proposed outdoor pool and spa located on level 06 for the Bloor Stree Project located a 1 Bloor St W.

    Jul 5, 2022 · 1 BLOOR ST W
Show 75 older records
  • Building permit22 172456Cancelled

    Revision to Alternative Solution to increase travel distance (greater than 45 M and up to 61.52 M) of the south pool deck located on level 6 on the Bloor One Project locatedc at one 1 Bloor Stree W

    Jul 5, 2022 · 1 BLOOR ST W
  • Building permit22 102049Permit Issued

    Fit out for Hotel Amenities (Lobby, Restaurant, Fitness Area and Public washrooms) and back of house spaces for Hotel services and staff (Offices, Washrooms, Change rooms and Kitchen) in Connection with New Mixed Use building.

    Jun 22, 2022 · 1 BLOOR ST W
  • Building permit21 247526Permit Issued

    Proposed interior alterations for fit-out of cafeteria with bar and lounge and kitchen space

    Jun 22, 2022 · 1 BLOOR ST W
  • Building permit19 106142Cancellednew building

    Conditional Permit - Proposal to construct an 86 storey mixed use apartment building with 4 levels of below grade commercial parking and one level of below grade commercial space.

    Sep 3, 2021 · 1 BLOOR ST W
  • Building permit21 149245Approved

    Alternative Solution for increased travel distance of the south pool deck (Level 06)

    May 3, 2021 · 1 BLOOR ST W
  • Building permit21 114996Cancelled

    Proposed outdoor pool and spa deck deisgn

    Feb 10, 2021 · 1 BLOOR ST W
  • Zoning review20 230612 PRZClosed
    Jan 3, 2021 · 1 BLOOR ST W
  • Development application20 230612 STE 11 OZClosed

    Zoning By-law Amendment Application to permit a 94-storey mixed use building, containing 505 dwelling units and 17,669 square metres of non-residential gross floor area. OLT Appeal: withdrawn by applicant - OLT order in attachments

    Dec 18, 2020 · 1 BLOOR ST W · City file
  • Building permit20 230407Cancelled

    Proposal for interior alterations tenant fit out in the concourse level on the ground floor and a unit on the 2nd floor for retail use.

    Dec 18, 2020 · 1 BLOOR ST W
  • Building permit19 261806Approved

    AS-FIRE STANDPIPE in the Exit stair wellProposal to construct a 86 storey mixed use building with 4 levels of below grade commercial parking and one level of below grade commercial space.

    Dec 16, 2019 · 1 BLOOR ST W
  • Building permit19 261804Approved

    AS-4 storey multi-level dwelling units and fire separation for floor assemblies

    Dec 16, 2019 · 1 BLOOR ST W
  • Building permit19 261803Approved

    AS-OUTDOOR POOL

    Dec 16, 2019 · 1 BLOOR ST W
  • Building permit19 261800Refused

    AS-WATER CURTAINS SERVING CONCOURSE & P1Proposal to construct a 86 storey mixed use building with 4 levels of below grade commercial parking and one level of below grade commercial space.

    Dec 16, 2019 · 1 BLOOR ST W
  • Building permit15 260226Revision Issued

    REV04: Revision to permit 15-260226 BLD. Revision to existing shoring permit to remediate soil in connection with mixed use development. REV03 - Proposal for stand-alone shoring for Soil Remediation

    Sep 10, 2019 · 1 BLOOR ST W
  • Building permit16 246196Revision Issued

    REV -01 to the exterior faced of the building.Proposal to demolish the rear portion of the building (Phase 2) leaving the front portion for heritage reasons. Phase 1 was completed in BLD 16 136134

    Sep 25, 2018 · 774 YONGE ST
  • Building permit18 207252Cancelled

    Drain - Proposal to construct a new 3 storey commercial retail building with four levels of below grade parking and one level of retail concourse below.

    Aug 10, 2018 · 1 BLOOR ST W
  • Building permit16 136134Closed

    Proposal to demolish 1 & 2 storey portions at rear and restore rear wall of existing commercial building.

    Apr 22, 2016 · 774 YONGE ST
  • Building permit15 224289Closed

    Proposal to erect and dispaly two static non-illuminated ground signs, containing two sign faces, one at the north frontage (Bloor St.) and the other at the east frontage (Yonge St.). Each face of the proposed ground signs measure at 2.53 metres vertically by 7.72 metres horizontally at a height of 6.92 metres above grade.**DEVELOPMENT SIGNS**

    Oct 1, 2015 · 1 BLOOR ST W
  • Zoning review15 128257 PSPClosed
    Mar 23, 2015 · 1 BLOOR ST W
  • Zoning review15 128261 PRZClosed
    Mar 23, 2015 · 1 BLOOR ST W
  • Development application15 128257 STE 27 SAClosed

    Proposal for site plan approval for an 80 storey mixed-use building, the first 8 storey above grade will be used for retail, as well as the first storey below grade, eight levels of underground parking will be provided and a total of 544 residential units

    Mar 16, 2015 · 1 BLOOR ST W · City file
  • Development application15 128261 STE 27 OZClosed

    Proposal for an 82 storey (306 metres) mixed-use building.

    Mar 16, 2015 · 774 YONGE ST · City file
  • Building permit15 104622Closeddemolition

    Proposal to demolish existing 3 storey mixed use non-residential building. Includes 780 to 784 Yonge Street.

    Feb 9, 2015 · 780 YONGE ST
  • Building permit15 104613Closeddemolition

    Proposal to demolish existing 2 storey retail building.

    Feb 9, 2015 · 770 YONGE ST
  • Building permit15 107080Cancelleddemolition

    Proposal to demolish existing 3 storey mixed use building.

    Jan 21, 2015 · 774 YONGE ST
  • Building permit15 101609Closeddemolition

    Proposal to demolish existing 3 storey retail building.

    Jan 16, 2015 · 11 BLOOR ST W
  • Building permit15 101573Closeddemolition

    Proposal to demolish existing 3 storey retail building. Conveniencve address - 786 YONGE STREET.

    Jan 16, 2015 · 1 BLOOR ST W
  • Building permit14 250720Closeddemolition

    Proposal to demolish existing 2 storey mixed use commercial building

    Nov 28, 2014 · 778 YONGE ST
  • Building permit13 264852Closed

    To erect and display one illuminated wall sign. **XBox One**

    Nov 19, 2013 · 11 BLOOR ST W
  • Building permit13 188031Cancelled

    To erect and display an illuminated static copy wall sign at the second storey of the northerly elevation and a non-illuminated overhanging structure sign at the first storey of the easterly elevation of the building in conjunction with a new retail ice cream store to operate on the premises. **Magnum Toronto**

    Jul 4, 2013 · 11 BLOOR ST W
  • Zoning review13 163101 LTOClosed
    May 6, 2013 · 11 BLOOR ST W
  • Zoning review12 243804 LTOClosed
    Sep 10, 2012 · 778 YONGE ST
  • Building permit11 222533Closed

    Proposal to alter basement roof of retail space. Basement roof is located on public side of property.

    Jul 13, 2011 · 11 BLOOR ST W
  • Building permit10 299526Closed

    To erect and display one non-illuminated projecting sign at the southerly-facing first storey building wall, in conjunction with an existing financial use located on the premises. **Money Mart**

    Nov 26, 2010 · 778 YONGE ST
  • Zoning review10 246675 ZPRClosed
    Aug 25, 2010 · 1 BLOOR ST W
  • Zoning review10 120593 ZSVClosed
    Feb 19, 2010 · 778 YONGE ST
  • Zoning review09 196692 LTOClosed
    Dec 15, 2009 · 778 YONGE ST
  • Zoning review09 190043 ZSVClosed
    Nov 20, 2009 · 774 YONGE ST
  • Zoning review09 174307 ZPRClosed
    Sep 30, 2009 · 774 YONGE ST
  • Zoning review09 118272 LTOClosed
    Mar 19, 2009 · 780 YONGE ST
  • Zoning review08 162481 ZPRClosed
    May 26, 2008 · 1 BLOOR ST W
  • Zoning review08 118061 ZSVClosed
    Mar 10, 2008 · 11 BLOOR ST W
  • Zoning review08 103572 ZPRClosed
    Jan 16, 2008 · 11 BLOOR ST W
  • Building permit07 286053Closed

    Move wall to adjust size of existing Accessible WC on GF to existing Restaurant.

    Dec 27, 2007 · 774 YONGE ST
  • Building permit07 280497Closed

    Relocate kitchen exhaust hood.

    Dec 3, 2007 · 774 YONGE ST
  • Zoning review07 218451 ZSVClosed
    May 16, 2007 · 1 BLOOR ST W
  • Building permit07 103611Closed

    HVAC - Revise plans as approved- Make interior alterations to existing retail unit; alter facade of building & extent facade vertically for new encroaching parapet wall/'canopy'.

    May 9, 2007 · 770 YONGE ST
  • Zoning review07 170425 ZSVClosed
    Apr 24, 2007 · 770 YONGE ST
  • Zoning review07 137875 ZPRClosed
    Apr 3, 2007 · 1 BLOOR ST W
  • Zoning review06 158135 ZPRClosed
    Jul 19, 2006 · 774 YONGE ST
  • Zoning review06 134729 ZPRClosed
    May 12, 2006 · 774 YONGE ST
  • Zoning review06 110284 ZPRClosed
    Feb 16, 2006 · 770 YONGE ST
  • Zoning review06 110269 ZPRClosed
    Feb 16, 2006 · 770 YONGE ST
  • Zoning review05 189578 LTOClosed
    Oct 3, 2005 · 774 YONGE ST
  • Building permit04 121478Closed

    Interior alterations to retail store for change to Money Mart store ( group D)

    Apr 1, 2004 · 778 YONGE ST
  • Zoning review03 168649 ZSVClosed
    Aug 22, 2003 · 1 BLOOR ST W
  • Zoning review03 161413 ZPRClosed
    Jul 29, 2003 · 1 BLOOR ST W
  • Zoning review03 113287 LTOClosed
    Mar 7, 2003 · 774 YONGE ST
  • Zoning review02 195733 ZPRClosed
    Dec 12, 2002 · 1 BLOOR ST W
  • Building permit02 144039Closed

    provide shop drawing for sprinkler system Drawings submitted Aug.26, 2002.

    Sep 9, 2002 · 774 YONGE ST
  • Zoning review02 166120 LTOClosed
    Aug 21, 2002 · 776 YONGE ST
  • Building permit02 132516Closed

    make interior alterations

    Jun 7, 2002 · 774 YONGE ST
  • Zoning review02 121286 ZPRClosed
    Mar 25, 2002 · 11 BLOOR ST W
  • Zoning review02 119201 ZSVClosed
    Mar 18, 2002 · 11 BLOOR ST W
  • Zoning review02 112691 ZPRClosed
    Feb 21, 2002 · 11 BLOOR ST W
  • Building permit01 163735Closed

    alter hvac system cost included in 01-163725tenant: french connection

    Jul 31, 2001 · 11 BLOOR ST W
  • Building permit01 163725Closed

    make interior alterations to existing retail store, & alter storefronttenant: french connection Bulk Site review up to Sept. 1/2004 have been filled in permit file.

    Jul 31, 2001 · 11 BLOOR ST W
  • Building permit01 108187Closed

    Reconstruct front entrace by changing door to revolving type door with north side emergency exit and install curved partition walls and modify drop ceiling.

    Feb 23, 2001 · 780 YONGE ST
  • Zoning review01 035480 ZSVClosed
    Feb 21, 2001 · 1 BLOOR ST W
  • Zoning review00 363295 000Closed
    Dec 20, 2000 · 1 BLOOR ST W
  • Zoning review00 363235 000Closed
    Dec 20, 2000 · 780 YONGE ST
  • Zoning review91 026397 LTOClosed
    Apr 29, 1991 · 780 YONGE ST
  • Zoning review89 030523 LTOClosed
    Nov 30, 1989 · 1 BLOOR ST W
  • Zoning review85 026833 LTOClosed
    Jul 26, 1985 · 778 YONGE ST
  • Zoning review82 025673 LTOClosed
    Jan 27, 1982 · 780 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(62)

    Needs a closer look

    22 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(62)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On 760-762 Yonge Street, 768-784 Yonge Street and 1-11 Bloor Street West, if the requirements of Section 6 and Schedule A of By-law 685-2020(LPAT) are complied with, buildings or structures may be constructed in compliance with

  2. Rule B

    to (T) below; (B) Despite Regulations 40.5.40.10(1) and (2), the height of a building or structure is the distance between the Canadian Geodetic Datum elevation of 115.8 metres in the year 2019 and the elevation of the highest point of the building or structure

  3. Rule C

    Despite Regulation 40.10.40.10(1), no portion of a building or structure erected on the lands may exceed the height in metres specified by the numbers following the symbol HT on Diagram 3 of By-law 685-2020(LPAT)

  4. Rule D

    Despite (C) above, and regulations 40.5.40.10(3) to (7), the following building elements are permitted to project above the heights shown on Diagram 3 of By-law 685-2020(LPAT): (i) window washing equipment, building maintenance units, trellises, canopies and outdoor amenity structures – a maximum vertical projection of 5.3 metres; (ii) main entrance canopies – a maximum vertical projection of 14.0 metres above the height within any area not having a height limit shown on Diagram 3; (iii) parapets, railings, guard rails and lightning rods – a maximum vertical projection of 1.8 metres; (iv) wind protection screens, stairs, and stair and elevator enclosures and terrace dividers – a maximum vertical projection of 3.0 metres; (v) roof drainage – a maximum vertical projection of 0.5 metres; (vi) architectural features, pillars, columns, piers, beams, hybrid exoskeleton structures and hybrid exoskeleton cladding – a maximum vertical projection of 16.5 metres above the height within the area identified as HT 292.5 as shown on Diagram 3 of By-law 685-2020(LPAT); and (vii) hard and soft landscaping and public art

  5. Rule E

    Regulation 600.10.10 with respect to Building Setbacks does not apply

  6. Rule F

    Despite Clause 5.10.40.70, and regulations 40.10.40.70(1) and 40.10.40.80(1), the required minimum building setbacks and above ground separation distance between main walls are as shown on Diagram 3 of By-law 685-2020(LPAT)

  7. Rule G

    Despite (D) above, the minimum building setbacks of the ground floor of a building or structure on Parcel 1 will be shown on Diagram 4 of By-law 685-2020(LPAT)

  8. Rule H

    Despite (D) above, the minimum building setbacks of the tower floor plates of a building or structure on Parcel 1 between the heights of 69.0 metres and 75.0 metres, 132.0 metres and 138.0 metres, 196.0 metres and 202.0 metres, 265.0 metres and 271.0 metres, will be as shown on Diagram 5 of By-law 685-2020(LPAT)

  9. Rule I

    Despite (D) above and regulations 40.10.40.60(2) to (9), the following encroachments are permitted to encroach into the required minimum building setbacks and above ground separation distance between main walls on Diagram 3 of By-law 685-2020(LPAT): (i) awnings and canopies – a maximum of 6.6 metres; and (ii) doors, revolving doors, signage, roof drains, gutters, flashing, tie-ins to adjacent buildings , cornices, ornamental elements, parapets, architectural flutes, ornamental louvers, piers, pillars, beams, hybrid exoskeleton structures , hybrid exoskeleton cladding, window sills, light fixtures, art and landscape features and site servicing features – a maximum of 1.2 metres

  10. Rule J

    Balconies are not permitted to encroach into the required minimum building setbacks and above ground separation distance between main walls shown on Diagram 3 of By-law 685-2020(LPAT)

  11. Rule K

    Despite Regulation 40.10.40.40(1) the total gross floor area of all buildings and structures on Parcel 1 and Parcel 2 as shown on Diagram 3 of By-law 685-2020(LPAT), must not exceed 80,000 square metres, provided: (i) residential uses symbolized by the letter 'r', permitted by Regulations 40.10.20.10(1)(B) and 40.10.20.20(1)(B), must not exceed 62,500 square metres; (ii) non-residential uses symbolized by the letter 'c', permitted by Regulations 40.10.20.10(1)(A) and 40.10.20.20(1)(A), must not exceed 18,000 square metres excluding public parking ; and (iii) for the purposes of this By-law, in addition to Section 40.5.40.40(1), the calculation of gross floor area also excludes the floor area associated with mechanical rooms and indoor amenity space

  12. Rule L

    a minimum of 10 percent of the total number of dwelling units must: (i) have a minimum area of 79.0 square metres; and (ii) contain at least two bedrooms

  13. Rule M

    Despite Regulation 40.10.40.50(1), amenity space must be provided at a minimum rate of 3.5 square metres for each dwelling unit , of which: (i) at least 1.7 square metres for each dwelling unit is indoor amenity space ; (ii) at least 40.0 square metres is outdoor amenity space in a location adjoining or directly accessible to the indoor amenity space ; and (iii) no more than 25 percent of the outdoor component may be a green roof

  14. Rule N

    Despite 40.10.40.50(2), no outdoor amenity space is required for non-residential uses

  15. Rule O

    Despite Regulation 200.5.10.1(1) and Table 200.5.10.1, a minimum of 296 parking spaces must be provided and maintained as follows: (i) parking spaces may be shared between residents, residential visitors and non-residential uses; (ii) parking spaces for residents, residential visitors and non-residential uses may be located within public parking ; (iii) a minimum of 277 parking spaces must be provided within public parking , of which, a minimum of 200 parking spaces must be available to residents; (iv) a minimum of 4 car-share parking spaces must be provided; (v) a minimum of 15 short-term parking spaces must be provided, of which, 5 short-term parking space may be obstructed on one side; and (vi) despite Clauses 200.15.1 and 200.15.1.5 and (M)(v) above, at least one short-term parking space must have a minimum width of 3.9 metres, a minimum length of 5.6 metres and a minimum vertical clearance of 2.1 metres and may be located below-ground, and would satisfy the requirements of regulation 200.15.10

  16. Rule P

    Despite Section 200.5.1.10(2)(A)(iv), a maximum of 33 parking spaces may be obstructed on one side and have the following dimensions; (i) a minimum width of 2.6 metres; (ii) a minimum length of 5.6 metres; and (iii) a minimum vertical clearance of 2.1 metres

  17. Rule Q

    Despite regulation 200.5.1.10(2)(A), a maximum of 3 small car parking spaces may be provided and accessed by a drive aisle with a minimum width of 5.4 metres, each having a dimension of a minimum width of 3.2 metres, a minimum length of 5.1 metres and a minimum vertical clearance of 2.0 metres

  18. Rule R

    Despite Regulation 200.5.1.10(5) a maximum of 78 parking spaces that are required in order to satisfy the residential parking requirements, as set out in section (K) above, may be provided as 39 tandem parking spaces , of which, 35 tandem parking spaces may be provided in stacked parking spaces

  19. Rule S

    Despite the dimensions outlined in Regulation 200.5.1.10(2), stacked parking spaces can have: (i) a minimum width of 2.6 metres; (ii) a minimum length of 5.6 metres; (iii) a minimum vertical clearance of 1.5 metres; and (iv) stacked parking spaces mechanisms and equipment located within these dimensions

  20. Rule T

    Despite Regulations 220.5.10.1(1) to (9), the following minimum number of loading spaces must be provided and maintained on the lands: (i) one Type "G" loading space ; (ii) one Type "B" loading space ; and (iii) three Type "C" loading spaces

  21. Rule U

    Despite Regulation 230.5.1.10(9), long-term bicycle parking spaces and short-term bicycle parking spaces can be located below ground and in stacked bicycle parking spaces

  22. Rule V

    Despite the dimensions set out in Regulations 230.5.1.10(4) and (5), stacked bicycle parking spaces provided on the lands shall have the following dimensions: (i) a minimum width of 0.6 metres; (ii) a minimum length of 1.8 metres; and (iii) a minimum vertical clearance of 1.2 metres

  23. Older by-law A

    Section 12(2) 259 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
2,231 m²
Frontage
48.2 m
Depth
54 m
Street
Bloor St W
Corner lot
Yes, also on Yonge St54 m along it
Public lane
Ln S Bloor E Balmuto, 35.1 m along it
Max height
61 m
Max lot coverage
—
  • Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Bloor Street West, Yonge Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 7.8 (c4.5; r7.8) SS1 (x62) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
97%29 of 30 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
54

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 30 variance decisions: more than at 63% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards for the mixed-use development (approved a northern building height of 35-storeys (124.5 m) under Site Specific Zoning By-law 302-2023), and increased to 39-storeys (135.5 m as approved under Minor Variance Decision A0018/24TEY), by further increasing the northern building height to 44-storeys (142.75 m, excluding the mechanical penthouse) inclusive of an 11-storey podium base building (38.65 m), increasing the maximum gross floor area, residential gross floor area, and reducing the outdoor amenity spaces. Also, the existing 10-storey office building (located at the southern limits of this subject site) will be maintained and unaltered. There will be a total of 329 residential dwelling units on this lot.

    1235 BAY ST · Oct 14, 2026 · 244 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-Law 697-2021(OLT), for a new 50-storey mixed-use building (as approved under Committee of Adjustment Files A0612/23TEY and A0231/25TEY), by increasing the maximum total gross floor area, maximum building height (60.2 m to 61.25 m at the east side portion of the building), altering the minimum building setbacks, and reducing the required bicycle parking spaces. There will be a total of 267 residential dwelling units on this lot.

    874 YONGE ST · Aug 5, 2026 · 303 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1050-2015) for the 68-storey mixed-use building (north-east Tower) by increasing the building height from 215 m to 218.6 m (including the height of the mechanical penthouse). Also, to reduce the total number of commercial parking spaces (managed by the Toronto Parking Authority) from 800 to 795 within Parking Levels 1 to 6 (with five parking spaces located on the south-east portion of Parking Level 6 being converted into car wash bays). The existing 196 residential parking spaces on Parking Levels 3 and 4 will be maintained and unaltered.

    27-29 YORKVILLE AVE · Jul 15, 2026 · 223 m away
  • Minor varianceApproved

    To alter the existing residential dwelling unit by converting it into two separate residential dwelling units (occupying the second and third storeys of the existing three-storey mixed-use building). Also, to extend the existing commercial unit (currently occupying the ground floor) into the basement.

    106 SCOLLARD ST · Jun 10, 2026 · 491 m away
  • Minor varianceApproved

    To permit a massage therapy use on a portion of the ground floor area of the three-storey mixed-use building. The existing recreation use (pilates studio occupying the basement floor), office units (occupying the remaining portion of the ground floor, and the entire second floor), and one residential dwelling unit (occupying the entire third floor) will be maintained and unaltered.

    80 SCOLLARD ST · May 6, 2026 · 432 m away

Latest activity nearby

  • Zoning review

    Application Acceptable

    12 CUMBERLAND ST · Nov 24, 2026 · 165 m away
  • Building permit

    1 wall sign + 1 projecting sign***HELLO NORI***

    1250 BAY ST · Nov 24, 2026 · 270 m away
  • Zoning review

    Application On Hold

    649 YONGE ST · Nov 23, 2026 · 236 m away
  • Building permit

    Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies.

    40 ASQUITH AVE · Nov 20, 2026 · 274 m away
  • Building permit

    6 overhanging structure signs**AEVUM**

    11 YORKVILLE AVE · Nov 19, 2026 · 221 m away
  • Building permit

    Proposal for new Sprinklers System on the 3rd floor public corridor.

    60 BLOOR ST W · Nov 19, 2026 · 167 m away
  • Building permit

    Proposed interior alterations to an existing office

    2 BLOOR ST E · Nov 18, 2026 · 154 m away
  • Building permit

    One wall sign.***SIGNATURE HAIR STUDIO***

    665 YONGE ST · Nov 18, 2026 · 185 m away
  • Building permit

    Proposal for interior alterations to an existing office.

    2 BLOOR ST E · Nov 17, 2026 · 154 m away
  • Building permit

    INTERIOR RENOVATION OF AN EXISTING CONDO SUITE IN EXISTING CONDOMINIUM - UNIT 4802

    50 YORKVILLE AVE · Nov 16, 2026 · 278 m away

Neighbourhood: Bay-Cloverhill

About the area around the lot, not the lot itself.

Nearest station
Bloor Station2 min walk
Nearest TTC stop
Bloor St East at Yonge St1 min walk
Nearest cycling route
Yonge StCycle Track, 1 min walk
Nearest traffic count
16,676 vehicles in 14 hBloor St E / Yonge St / Bloor St W, 50 m away, Jun 25, 2025
Serious collisions within 500 m
102021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 3 with cyclists
Parks
George Hislop Park3 min walk
St. Mary Street Parkette3 min walk
Town Hall Square4 min walk

Schools within 1 km

  • HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 4 min walk
  • ROSEDALE DAY SCHOOL Private 7 min walk
  • MCDONALD INTERNATIONAL ACADEMY SCHOOL Private 8 min walk
  • CAREER QUEST - TORONTO Private 9 min walk
  • JESSE KETCHUM JR & SR PUBLIC SCHOOL English Public 9 min walk
  • THE ABELARD CENTRE FOR EDUCATION Private 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBay-CloverhillMedian neighbourhood
Median household income (2020)$58,400$84,500
Households that own their home30%54%
Population (2021)16,67016,813
Homes built in 1960 or before4%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBay-CloverhillCity median
Assault601.9636.3
Robbery74.769.5
Auto theft16.6192.6
Theft over $5,00087.246.1
Break and enter286.4172.8
Theft from vehicles145.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.