HousePrecheckCheck an address

1-33 Gabian WayToronto · zoning, lot size and permit records

Also 11 Gabian Way, 13 Gabian Way, 15 Gabian Way, 17 Gabian Way, 19 Gabian Way and 12 more

Residential apartment · RA (u248) (x488)≈ 94.2 × 129.3 m9,659 m²on Gabian Waycorner, also on Yore Rd

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 18 storeys, 248 rental units, built 1993More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 20 142462 (Proposed reconstruction of the exterior wall assembly due to vehicle impact. Includes r..., 2020, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 45 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
  • City upkeep score: 99 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: CaledoniaThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
≈ 94.2 m frontage≈ 129.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2020

    Needs a closer look

    Still open in the City's records: 20 142462 (Proposed reconstruction of the exterior wall assembly due to vehicle impact. Includes r..., 2020, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 4 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards): 26 216015 PRS 00 IR (Property Standards, 2026); 26 194678 PRS 00 IV (Order Issued Property Standards: The tree, plant, limb or branch, which is located on t..., 2026); 26 191027 PRS 00 IR (Property Standards, 2026); and 1 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 45 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 99 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (18 storeys, 248 units, built 1993).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 216015 PRS 00 IRClosed

    Property Standards

    Aug 7, 2026 · 1-33 GABIAN WAY
  • By-law investigation26 194678 PRS 00 IVClosed

    Order Issued Property Standards: The tree, plant, limb or branch, which is located on the property is dead and has not been removed or otherwise pruned to remove the dead portion.Namely, a dead

    Jun 25, 2026 · 1-33 GABIAN WAY
  • By-law investigation26 191027 PRS 00 IRClosed

    Property Standards

    Jun 25, 2026 · 1-33 GABIAN WAY
  • By-law investigation25 139088 PRS 00 IRClosed

    Property Standards

    Apr 3, 2025 · 1-33 GABIAN WAY
  • Building permit23 115866Closed

    Proposal for localized window and brick replacement around building concentrated on the south elevation of an existing apartment building.

    Apr 24, 2023 · 1-33 GABIAN WAY
  • Building permit22 112165Closed

    INSTALLATION OF FIRE ALARM DEVICES FOR ELEVATOR MOD. SIGNALS

    May 6, 2022 · 1-33 GABIAN WAY
  • Building permit20 219539Closed

    HVAC - Proposed interior alterations to convert an existing vacant party room into an office

    May 5, 2021 · 1-33 GABIAN WAY
  • Building permit20 142462Inspection

    Proposed reconstruction of the exterior wall assembly due to vehicle impact. Includes removal and replacement of the impact damaged aluminum frame windows, adjacent door and interior finishes.

    Jun 3, 2020 · 1-33 GABIAN WAY
Show 2 older records
  • Building permit08 221028Closed

    To replace existing chiller and cooling tower with new one.

    Nov 19, 2008 · 33 GABIAN WAY
  • Building permit07 248646Closed - Dormant

    Apartment Building - minor masonry repairs and sealant replacement, Under Ground Parking Garage concrete repairs and waterproofing.

    Aug 28, 2007 · 1-33 GABIAN WAY

Check before you build

  • Exception 900.7.10(488) does not apply to this address

    Good to know

    The exception covers this area, but each of its 1 parts names other addresses. The standard rules on this page apply.

    Zoning By-law 569-2013, Chapter 900
Exception 900.7.10(488)Does not apply

Every part of the exception names other addresses. The standard rules apply to this lot.

1 part for other addresses
  • A On 2322-2400 Eglinton Ave. W. and 9-11 Glenhaven St., Section 16(317) of the former City of York zoning by-law 1-83.
By-law 569-2013, Chapter 900

Lot facts

Area
9,659 m²
Frontage
94.2 mestimated, irregular lot
Depth
129.3 mestimated, irregular lot
Street
Gabian Way
Corner lot
Yes, also on Yore Rd129.3 m along it
Public lane
None
House footprint
1,512 m²roof up to 61.1 m
Back yard
45.5 mhouse to rear lot line
Side yards
7.2 m and 45 mhouse to side lot lines
Buildings on the lot
5house, garage, sheds
Max height
24 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Caledonia. The lot is inside the Caledonia Major Transit Station Area approved by the Province (Site and Area Specific Policy 674). Source
  • Zone RA (u248) (x488) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: pine, austrian (19 cm), pine, austrian (19 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
88%14 of 16 decisions
Garden suite permits
2
Laneway suite permits
0
Multiplex permits
8
Development applications
6

Within 300 m, last 10 years. 10 suite and multiplex permits: more than at 75% of Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Not Started

    2471 EGLINTON AVE W · Nov 12, 2026 · 213 m away
  • Building permit

    INSTALL BACK WATER VALVE

    27 YORE RD · Oct 27, 2026 · 154 m away
  • Building permit

    Proposed alternative solution for vestibule door fire sprinkler

    2330 EGLINTON AVE W · Sep 28, 2026 · 284 m away
  • Zoning review

    Notice Sent

    7 BEECHBOROUGH AVE · Sep 21, 2026 · 246 m away
  • Zoning review

    Notice Sent

    5 BEECHBOROUGH AVE · Sep 17, 2026 · 244 m away
  • Zoning review

    Closed

    2522 EGLINTON AVE W · Aug 21, 2026 · 246 m away
  • Building permit

    Revision 03: Revision to permit, no attic in front extension/ Covered and conditioned Attic in existing building/ Cathedral ceiling in the back extension on 2nd floor/ Spray foam insulation across the exterior walls, attic, foundation walls in the basement, Double door and triangle shaped windows on the back wall of 2nd floor extension/ Change of washer and dryer in 2nd floor and basement/ Mechanical room change from front to back basement/ Change of window from south to north

    395 KANE AVE · Jul 17, 2026 · 268 m away
  • Zoning review

    Closed

    2528 EGLINTON AVE W · Jun 5, 2026 · 250 m away
  • Building permit

    Proposal for a new second storey addition, interior alterations and a rear wood deck.See also 25 185029 ZAP and 25 199319 MV.

    61 RICHARDSON AVE · Apr 21, 2026 · 297 m away
  • Building permitdemolition, multiplex

    Demolish existing 1 storey dwelling to construct a new fourplex

    55 LONBOROUGH AVE · Mar 31, 2026 · 76 m away

Neighbourhood: Beechborough-Greenbrook

About the area around the lot, not the lot itself.

Nearest station
Caledonia Station5 min walk
Nearest TTC stop
Eglinton Ave West at Gabian Way3 min walk
Nearest cycling route
Beltline TrlMulti-Use Trail, 5 min walk
Nearest traffic count
363 vehicles in 8 hLonborough Ave / Colfax St, 130 m away, Aug 31, 2005
Serious collisions within 500 m
82021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
Parks
Woodborough Park5 min walk
Kay Gardner Beltline Park5 min walk
Eglinton - Gilbert Parkette7 min walk

Schools within 1 km

  • CHARLES E WEBSTER JR PUBLIC SCHOOL English Public 8 min walk
  • SILVERTHORN COMMUNITY SCHOOL English Public 11 min walk
  • YORK MEMORIAL COLLEGIATE INSTITUTE (UNDER CONSTRUCTION) English Public 11 min walk
  • IMMACULATE CONCEPTION CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk
  • KEELESDALE JR PUBLIC SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBeechborough-GreenbrookMedian neighbourhood
Median household income (2020)$62,400$84,500
Households that own their home34%54%
Population (2021)6,26016,813
Homes built in 1960 or before42%29%
Homes needing major repairs12%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBeechborough-GreenbrookCity median
Assault692.3636.3
Robbery148.369.5
Shootings12.410.5
Auto theft247.2192.6
Theft over $5,00037.146.1
Break and enter111.3172.8
Theft from vehicles148.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.